NEW QUESTION NO: 7
In VRTX the following features are enabled:
1. Server Module Firmware Update
2. Remote syslog
3. iDRAC Single Sign-on.
4. Server configuration
5. Chassis grouping
6. Enclosure level backup
Which license type is required?
A. CMC enterprise license
B. CMC express license
C. iDRAC express license
D. iDRAC enterprise license
Answer: A
Explanation/Reference:
Reference: http://en.community.dell.com/cfs-file/__key/telligent-evolution-components-attachments/13-
4491-00-00-20-40-24-15/VRTX-CMC_5F00_Feature-Guide.pdf?forcedownload=true

NEW QUESTION NO: 8
An engineer responsible for server lifecycle management (e.g. Monitor, Update, Deploy) needs to build a monitoring strategy for a multi-vendor data center. The company has an established third party software as the monitoring and help desk system.
Which option should be used to integrate Dell Server hardware into this monitoring architecture?
A. Configure all Dell iDRACs to send alerts to OME to filter out wanted alerts and forward to the third party console. Build script to do the rest of the Dell server lifecycle management.
B. Configure all Dell iDRACs to send alerts to OME to filter out wanted alerts and forward to the third party console. Use OME to do lifecycle management of Dell servers in the environment.
C. Configure all Dell iDRACs to send alerts to the third party console. Use iDRAC to perform update and deployment.
D. Configure all Dell iDRACs to send alerts to the third party console. Use OME to do the rest of the lifecycle management.
Answer: B

NEW QUESTION NO: 9
An engineer is deploying a chassis with four IOAs and connecting it to the top of rack (ToR) switch. The deployment mandate requires that the switches be presented as one logical unit. Future servers can be added to network with the minimal amount of configuration.
The following steps have been completed:
- IOAs are daisy-chained using ports 9 and 10
- Cabled ports 11 and 12 on IOA 1 to the ToR
- Configured a team on NIC ports 1 and 2 on the server
How should the IOMs be configured?
A. Programmable MUX
B. Stack
C. Full Switch
D. Virtual Link Trunking
Answer: A

NEW QUESTION NO: 10
An engineer is redeploying a blade chassis, and is logged into the CMC web interface. The engineer has configured the iDRACs for the blade servers.
When the engineer tries to log into one of the iDRACs, the connection fails. The engineer can ping the CMC from the engineer's workstation but can NOT ping the iDRACs. The engineer tries to ping the iDRAC IP from the CMC itself using the diagnostic tool, but that also fails.
Which two tasks should the engineer perform? (Choose two.)
A. Confirm subnet mask configuration on iDRAC
B. Disable firewall service on iDRAC
C. Check VLAN settings on the CMC and iDRAC
D. Update DNS servers for iDRAC
E. Enable IPv6 on the CMC and iDRAC
Answer: A,B

NEW QUESTION NO: 11
A VRTX has storage set up as a RAID 10 in a 16-drive disk group. Each drive is 1.6 TB for a total of 12.8 TB space in the disk group. There are currently 14 virtual disks of 600GB each. The engineer needs to create three more virtual disks. The engineer successfully creates two virtual disks but is unable to create the third because there are NO physical disks to choose from.
What must the engineer do to create the final virtual disk?
A. Perform a reconstruct of the physical disk group
B. Create a new disk group with additional physical disks
C. Update the Shared PERC 8 Firmware
D. Recreate the virtual disks with 400GB allocated
Answer: D

NEW QUESTION NO: 12
An engineer is troubleshooting a VRTX with the following configuration:
- Dual Shared PERC Internal cards in a fault tolerant configuration
- Nodes installed in SLOTS 1 and 2
- Virtual adapters set to Multiple Assignment
- Two virtual drives set to Full Access on SLOTS 1 and 2
The OS of the node in SLOT 1 shows more than the two disks assigned to it.
What should the engineer do to fix this issue?
A. Configure MPIO services in the OS of SLOT 1
B. Power cycle the node in SLOT 1 to reset the connections
C. Set the virtual adapters to Single Assignment
D. Set the virtual drives to No Access on SLOT 2
Answer: D

NEW QUESTION NO: 13
An engineer is configuring a new FD332 storage sled into an existing chassis in SLOT 3. The FD332 is NOT being detected by the assigned node.
Which two tasks must an engineer complete so that the FD332 is detected by the node? (Choose two.)
A. Power cycle the node
B. Enable the PERC in storage sled
C. Import the PERC license
D. Verify firmware is up to date
E. Reseat the FD332
Answer: B,D

NEW QUESTION NO: 14

Refer to the exhibit.
An engineer sets up FCoE boot on their server. The server fails during post.
What needs to be added to the NIC settings/option ROM to make booting successful?
A. The WWN of the FIP snooping bridge
B. The WWN of the storage target
C. The WWN of the FC port ID
D. The WWN of the fibre channel switch
Answer: C
Explanation/Reference:

NEW QUESTION NO: 15
Only one of the server nodes in the FX2s chassis can see the FD332.
How should the chassis be configured so that both nodes can see the storage?
A. Set storage mode to split dual host
B. Enable clustering in the CMC
C. Enable shared storage in the CMC
D. Set storage mode to joined dual host
Answer: A

NEW QUESTION NO: 16
An engineer is migrating an existing server node from an M1000E to a VRTX chassis. An error message appears during POST. The system will continue to boot, but can NOT see any of the chassis shared storage or PCIe devices mapped to the server slot. The engineer has already removed the original fabric interfaces in mezzanine slot B and C from the original system configuration.
Which action must the engineer complete to allow the node to see chassis storage and mapped PCIe devices?
A. Enable PCIe Pass-Through in System Setup
B. Install PCIe Pass-Through mezzanine cards
C. Remap chassis storage/PCIe devices
D. Update the CPLD firmware version
Answer: A

NEW QUESTION NO: 17
An engineer is configuring a new FD332 storage sled into an existing chassis in SLOT 3. The engineer is unable to create any RAID arrays although the drives are detected.
Which task should be completed to create RAID volumes?
A. Import the PERC license into the iDRAC
B. Change storage mode to joined in the CMC
C. Enable the PERC in storage sled.
D. Configure RAID in Ctrl+R
Answer: C